• <tr id="kr61e"></tr>
    
    
    <button id="kr61e"></button>
    <thead id="kr61e"><b id="kr61e"><em id="kr61e"></em></b></thead>
    1. 手机在线一区二区三区,国产精品无码无卡A级毛片,亚洲AVAV天堂Av在线精品一区二区 ,精品国产Ⅴ无码大片在线观看,欧AV美亚洲精品无码专区,国产一级淫片a免费播放口,亚洲 国产 制服 丝袜 一区,成熟女人特级毛片www免费

      News INFORMATION


      The construction method of marking can be divided into several categories


      Release time:2019/6/26 11:48:20 Source:www.eddcn.com/

      Abstract:Hand push the line width of ruling machine has the width of the hopper, commonly used 100 mm, 150 mm, 200 mm. Hot melt coating to be heated to 180-230 degrees Celsius to construction

      The construction method of lines from the result of wire drawing machine can be roughly divided into artificial marking method and mechanical construction method. Type artificial line is one of the hot melt marking the construction of the main and the most commonly used one kind of construction method. Hand push the line width of ruling machine has the width of the hopper, commonly used 100 mm, 150 mm, 200 mm. Hot melt coating to be heated to 180-230 degrees Celsius to construction, the working principle of hand push type line is the use of coating type construction, the construction, the solid cover coating into the hot kettle, melt after the flow state, put this push marker of insulation materials in the barrel. Line, introducing the molten coating line in the bucket, crossed the bucket directly on the road, because there is a certain gap between lines are linked to the ground, when push the marking machine, scrape on automatic flow and a straight line. In blow out of the line at the same time, the function of line synchronization in line evenly on the surface and a layer of reflective glass beads.

       
      1. The hand push type hot melt marking machine advantage construction with less equipment, long life, can be used for 3 to 5 years. Do marking reflective effect is better, the anti-pollution ability is strong, can keep for a long time and bright, has the good adhesion, excellent wear resistance and durability. Hot melt coating construction to prepare ahead of time, such as warning signs warning column, auxiliary tools, construction, as well as the necessary drawing board, fonts, etc. Clean the road: first of all on the road foundation treatment, was carried out on the road debris removal. If the road is difficult to use conventional methods to remove debris, steel brush is used road cleaner to be hard to remove, net road with wind blowing off the road debris, eventually reach the standard to meet the requirements of marking surface cleaning.
       
      2. Construction lofting: within the scope of the construction period, according to the construction drawings and technical requirements, measuring unreeling, so that the working standard control. After finishing the lofting, carries on the test. Early detection qualified, then please confirm to the supervision engineer. Qualified rear can be carried out under the procedure. Road marking construction precautions: construction, use high-pressure wind road net machine first road TuSha sundry blowing off, make sure the road without loose particles, dust, asphalt, oil and other impurities affecting the quality of marking and dry.
       
      3. Then according to the requirements of engineering design in the proposed construction sections using the artificial operation of the automatic feeding machine and auxiliary to pay-off, after required by coated under high-pressure airless spraying machine spraying and the type and dosage of supervision engineer for approval under the same paint (primer), besmear next machine after fully dry box self-propelled hot melt marking machine or walking type hot melt marking machine marking.
       

      Please indicate the source of the reprint:http://www.eddcn.com//en/news/3647.html。

      Contact us

      Get in touch with us. Please use the following contact at will.

      Enter Your name
      Please enter your mailbox account
      Fill out your message here
      Send success
      I'm sorry, your sending is wrong.

      Address:Shangdang town of Dantu District,Zhenjiang City,Jiangsu Province,China Telephone:+86 13852907688  fuhao@zjslxd.com www.eddcn.com/
      主站蜘蛛池模板: 国产精品不卡在线专区| 无码av中文字幕久久专区| 一区二区三区www污污污网站| 一级a一片在线播放国产| 三亚私人高清影院品牌加盟西瓜| 国产A级毛片久久久久久精品| 免费无码国产国模线观看 | 东京热一区二区三区无码视频| 国产99在线 | 亚洲| 内乡县| 色偷偷成人综合亚洲精品| 四虎影视一区二区三区| 爸爸跑运输我跟妈妈| 国产成人免费| 爱性久久久久久久久| 亚洲一本大道av久在线播放| 99精品久久天干天天| 国产美女极度色诱视频WWW| 中文字幕天堂资源网最新版| 亚洲aa综合aa国产| 性欧美牲交在线视频| 骚虎视频在线观看| 小小水蜜桃视频高清在线观看| 在线观看特色大片免费视频| 久久亲娱乐极品视觉盛宴| 日韩精品区一区二区三vr| 高清freexxxx性国产| 天堂久久久久VA久久久久| 97无码精品人妻一区二区三区| 少妇水多多无码92午夜福利| 成人自慰女黄网站免费大全| 国产内射老熟女AAAA| 欧美V亚洲V综合Ⅴ国产V| 亚洲 欧美 综合 另类 中字| 人妻回春交涉中出中文字幕| 中日韩视频在线观看一区二区三区不卡| 精品黑人一区二区三区| 国产极品精品免费视频能看的| 亚洲精品中文无线乱码| 精品无码久久久久久免费| 国产蜜臀精品一区二区三区|